| 01 | 01_13_01.doc |  | 2012-06-29 | 2013-01-08 | Design Guidelines for Energy & Environment |  |
| 01 | 01_13_51.doc |  | 2012-02-27 | 2013-01-08 | Electric Rebate Program |  |
| 01 | 01_13_52.doc |  | 2012-02-27 | 2013-01-08 | Gas Rebate Program |  |
| 01 | 01_17_00.doc |  | 2004-10-15 | 2013-01-08 | Brown EHS - Construction Safety & Environmental Management | |
| 01 | 01_17_71.doc |  | 2013-03-29 | 2013-03-29 | Contract Record Documents and Turnover Requirements |  |
| 01 | 01_17_72.xltx |  | 2013-03-29 | 2013-04-05 | Brown Building Equipment Data Sheet |  |
| 01 | 01_17_73.doc |  | 2013-03-29 | 2013-03-29 | Brown Trades-Specific Draft Operations & Maintenance Manual Submittal Sections | |
| 01 | 01_17_90.doc |  | 2013-03-11 | 2013-03-11 | Utility & Critical System Connections and Interruptions |  |
| 01 | 01_17_91.doc |  | 2013-03-11 | 2013-03-11 | Utility & Critical System Outage Checklist |  |
| 01 | 01_17_92.pdf |  | 2013-03-11 | 2013-03-11 | Utility & Critical System Outage Planning Flow Chart | |
| 04 | 04_01_00.doc |  | 2012-06-20 | 2012-11-27 | Masonry and Concrete Restoration |  |
| 05 | 05_01_00.doc |  | 2012-06-20 | 2012-12-10 | Metals |  |
| 05 | 05_05_13.doc |  | 2012-06-20 | 2012-11-28 | Factory Applied Metal Coatings |  |
| 06 | 06_01_00.doc |  | 2012-06-20 | 2012-11-28 | Wood and Plastic Restoration |  |
| 06 | 06_10_00.doc |  | 2012-06-20 | 2012-11-28 | Rough Carpentry |  |
| 06 | 06_40_00.doc |  | 2012-06-20 | 2012-11-28 | Finish Carpentry and Millwork |  |
| 07 | 07_21_00.doc |  | 2013-03-29 | 2013-03-29 | Building Insulation |  |
| 07 | 07_50_00.doc |  | 2012-05-01 | 2012-11-28 | Roofing Systems |  |
| 07 | 07_62_00.doc |  | 2012-06-20 | 2012-11-28 | Sheet Metal Flashing and Trim |  |
| 07 | 07_72_00.doc |  | 2012-06-20 | 2012-11-28 | Roof Accessories |  |
| 07 | 07_92_00.doc |  | 2013-03-29 | 2013-03-29 | Joint Sealers |  |
| 08 | 08_10_00.doc |  | 2012-06-20 | 2012-11-28 | Doors and Frames |  |
| 08 | 08_44_00.doc |  | 2013-03-29 | 2013-03-29 | Curtain Walls |  |
| 08 | 08_71_00.doc |  | 2012-12-20 | 2013-01-02 | Door Hardware |  |
| 08 | 08_80_00.doc |  | 2013-03-29 | 2013-03-29 | Glazing |  |
| 09 | 09_21_16.doc |  | 2013-03-29 | 2012-11-28 | Gypsum Board Assemblies |  |
| 09 | 09_30_00.doc |  | 2012-06-20 | 2012-11-28 | Tiling |  |
| 09 | 09_51_00.doc |  | 2012-06-20 | 2012-11-28 | Acoustical Ceilings |  |
| 09 | 09_60_00.doc |  | 2012-12-20 | 2013-01-02 | Flooring |  |
| 09 | 09_72_00.doc |  | 2012-11-10 | 2013-01-02 | Wall Coverings |  |
| 09 | 09_90_00.doc |  | 2012-12-20 | 2013-01-02 | Paints & Coatings |  |
| 10 | 10_11_00.doc |  | 2012-11-10 | 2013-01-02 | Visual Wall Surfaces |  |
| 10 | 10_14_00.doc |  | 2012-12-20 | 2013-01-02 | Signage |  |
| 10 | 10_28_13.doc |  | 2012-12-20 | 2013-01-02 | Toilet Accessories | |
| 10 | 10_81_00.doc |  | 2012-11-10 | 2013-01-02 | Pest Control |  |
| 12 | 12_00_00.doc |  | 2012-11-10 | 2013-01-02 | Furniture, Fabrics, and Seating |  |
| 12 | 12_20_00.doc |  | 2012-11-10 | 2013-01-02 | Window Treatments | |
| 14 | 14_20_00.doc |  | 2013-03-26 | 2013-03-26 | Elevators | |
| 23 | 23_00_10.doc |  | 2012-08-03 | 2012-08-06 | HVAC Design Criteria |  |
| 23 | 23_05_23.doc |  | 2012-08-03 | 2012-08-06 | HVAC&R Valves |  |
| 23 | 23_05_29.doc |  | 2012-08-03 | 2012-08-06 | Hangers, Supports, and Sleeves - HVAC |  |
| 23 | 23_05_48.doc |  | 2012-08-03 | 2012-08-06 | Mechanical Sound, Vibration, and Seismic Control - HVAC |  |
| 23 | 23_07_13.doc |  | 2012-08-03 | 2012-08-06 | Duct Insulation |  |
| 23 | 23_07_16.doc |  | 2012-08-03 | 2012-08-06 | Mechanical Equipment Insulation |  |
| 23 | 23_07_19.doc |  | 2012-08-03 | 2012-08-06 | Mechanical Piping Insulation |  |
| 23 | 23_09_00.doc |  | 2012-08-03 | 2012-08-07 | Building Automation Systems Design Criteria |  |
| 23 | 23_09_01.doc |  | 2012-09-21 | 2012-09-21 | BAS Point Names, Descriptions, Graphics and Alarming | |
| 23 | 23_20_00.doc |  | 2012-08-03 | 2012-08-06 | HVAC Pipes and Tubes |  |
| 23 | 23_70_00.doc |  | 2012-08-03 | 2012-08-06 | Air Handling Units |  |
| 23 | 23_74_00.doc |  | 2012-08-03 | 2012-08-06 | Rooftop Air Handling Units |  |
| 23 | 23_75_00.doc |  | 2012-08-03 | 2012-08-06 | Packaged Rooftop Air Conditioning Units |  |
| 23 | 23_81_00.doc |  | 2012-08-03 | 2012-08-06 | Unitary Air Conditioning Equipment |  |
| 23 | 23_81_13.doc |  | 2012-08-03 | 2012-08-06 | Packaged Air Conditioners |  |
| 23 | 23_81_26.doc |  | 2012-08-03 | 2012-08-06 | Split System Air Conditioning Units |  |
| 26 | 26_00_10.doc |  | 2013-04-12 | 2013-04-15 | Electrical Design Criteria |  |
| 26 | 26_00_20.doc |  | 2005-10-25 | 2011-12-08 | Electric Trade Preferences |  |
| 26 | 26_05_10.doc |  | 2013-04-02 | 2013-04-05 | Conductors and Cable |  |
| 26 | 26_05_19.doc |  | 2013-04-02 | 2013-04-05 | Medium Voltage Cable and Accessories | |
| 26 | 26_05_26.doc |  | 2013-04-02 | 2013-04-05 | Grounding and Bonding |  |
| 26 | 26_05_33.doc |  | 2013-04-02 | 2013-04-05 | Raceway and Boxes |  |
| 26 | 26_05_43.doc |  | 2013-04-02 | 2013-04-05 | Underground Electrical Work |  |
| 26 | 26_05_90.doc |  | 2013-04-12 | 2013-04-15 | Motors |  |
| 26 | 26_08_01.doc |  | 2004-02-24 | 2011-12-08 | Electrical Testing |  |
| 26 | 26_09_01.doc |  | 2012-10-05 | 2012-10-09 | Campus Central Metering System Design Criteria |  |
| 26 | 26_09_02.doc |  | 2005-10-21 | 2011-12-08 | Campus Metering Network Connection Criteria |  |
| 26 | 26_09_03.pdf |  | 2012-10-05 | 2012-10-09 | Building Electric Meter Interconnection Detail |  |
| 26 | 26_09_04.pdf |  | 2012-10-05 | 2012-10-09 | Thermam (BTU) Meter Interconnection Detail |  |
| 26 | 26_09_05.pdf |  | 2012-10-05 | 2012-10-09 | Gas Meter Interconnection Detail |  |
| 26 | 26_09_06.pdf |  | 2012-10-05 | 2012-10-09 | Large Emergency Generator Metering and Load Shed Interconnection Detail | |
| 26 | 26_09_07.pdf |  | 2012-10-05 | 2012-10-09 | Small Emergency Generator Metering Interconnection Detail | |
| 26 | 26_12_00.doc |  | 2013-04-02 | 2013-04-05 | Medium Voltage Distribution Transformers | |
| 26 | 26_22_00.doc |  | 2013-04-02 | 2013-04-05 | Dry Type Transformers |  |
| 26 | 26_24_00.doc |  | 2013-04-12 | 2013-04-15 | Panelboards |  |
| 26 | 26_24_10.doc |  | 2013-04-02 | 2013-04-05 | Switchboards | |
| 26 | 26_27_26.doc |  | 2013-04-02 | 2013-04-05 | Wiring Devices |  |
| 26 | 26_29_23.doc |  | 2013-04-02 | 2013-04-05 | Variable Speed Drives | |
| 26 | 26_32_13.doc |  | 2013-04-02 | 2013-04-05 | Standby Power Systems |  |
| 26 | 26_50_00.doc |  | 2013-04-12 | 2013-04-15 | Interior Lighting |  |
| 26 | 26_56_00.doc |  | 2013-04-12 | 2013-04-15 | Exterior Lighting | |
| 27 | 27_05_00.doc |  | 2013-04-12 | 2012-11-12 | Communications |  |
| 27 | 27_40_00.doc |  | 2012-09-26 | 2012-11-12 | Classroom Audio/Visual Guidelines | |
| 28 | 28_31_10.doc |  | 2013-04-12 | 2013-04-15 | Fire Alarm Systems, Smoke Alarms, Carbon Monoxide Alarms and Detection Systems |  |
| 32 | 32_13_13.doc |  | 2012-09-30 | 2013-01-08 | Concrete Paving for Sidewalks | |
| 32 | 32_13_14.doc |  | 2012-09-30 | 2013-01-08 | Concrete Paving with Exposed Aggregate | |
| 32 | 32_14_00.doc |  | 2012-09-30 | 2013-01-08 | Unit Paving | |
| 32 | 32_17_23.doc |  | 2012-09-30 | 2013-01-08 | Pavement Markings | |
| 32 | 32_30_10.doc |  | 2012-09-30 | 2013-01-08 | Site Improvements | |
| 32 | 32_30_20.doc |  | 2012-09-30 | 2013-01-08 | Site Signage | |
| 32 | 32_30_30.doc |  | 2012-09-30 | 2013-01-08 | Memorial Trees and Benches | |
| 32 | 32_80_00.doc |  | 2012-11-12 | 2012-11-12 | Irrigation System | |
| 32 | 32_90_00.doc |  | 2012-09-30 | 2013-01-08 | Planting | |
| 32 | 32_92_00.doc |  | 2012-09-30 | 2013-01-08 | Turf and Grasses | |